Make the FF&E handoffs work.
Connect owner-furnished furniture, fixtures and equipment to a ready site and a defined installation package.
Your purchasing arrangement can remain with your chosen partner. The construction scope should make clear how the goods, the site and the installation meet.

Follow the package through the handoffs.
An order confirmation, a delivery and a completed installation are different milestones. The handoffs between them deserve as much attention as the product selection.
Selection & order
Confirm the source, quantities, dimensions and party placing the order.
Delivery & condition
Agree receipt, damage reporting, storage and discrepancy decisions.
Ready to install
Confirm access, preceding work, dimensions and available goods.
Installed & reviewed
Define the installation checks, remaining items and review responsibilities.
Make proposals comparable.
Whether the invitation is for a GC package or a separately defined installation scope, the proposal needs a common basis. Resolve supply, freight, storage and specialist responsibilities rather than leaving them implied.
Define the agreed boundary.
- The package
- Items, quantities, locations and the installation being requested.
- The inputs
- Current specifications, dimensions, condition and delivery information.
- The dependencies
- Preceding work, access, storage and readiness decisions.
- The exceptions
- Missing, late, damaged or incompatible goods and the change route.
Small checks protect the larger result.
Dimensions, alignment and condition can determine whether an item is ready to install or needs a decision. A practical checking process keeps the issue connected to the right person before the work moves on.
Working with your purchasing teamWhat is supplied, and what needs installing?
Include the proposed contract relationship, who retains purchasing and the approximate package. Detailed schedules and confidential documents can follow through an agreed channel.